- June 1, 1938
- Founded in Kawasaki City, Kanagawa Prefecture
- January 14, 1958
- Reorganized into a corporation
- October 25, 1963
- Started relocating major facilities to Yanagihashi, Yamato City, Kanagawa Prefecture under a five-year plan.
- 1968
- Completion of relocation of main facilities to Yanagihashi, Yamato City, Kanagawa Prefecture
- 1971
- New 6-ton (currently 8-ton) air drop hammer
- 1974
- Updated high-voltage power receiving equipment (6KV) to special high-voltage power receiving equipment (5,000KVA/ 60KV)
- 1978
- Started soundproofing measures at forging plants.
- 1982
- 10-ton air drop hammer operation
- 1982
- Introduction of double-acting hydraulic press No. 1 in the hammer line
- 1985
- New cross-roll forging equipment
- 1987
- Introduction of double-acting hydraulic press Unit 2
- 1988
- 4,000 tons New high-speed screw press (manufactured by Jimpelkamp)
- 1992
- September improved continuous quality furnace started operation
- September 1992
- Introduction of 3D CAD/CAM
- September 1993
- Expansion of mold factory
- September 1995
- New 2,000-ton masse forging press
- December 1996
- Introduction of double-acting hydraulic press Unit 3
- August 2002
- Installation of 3D measuring instruments
- January 2004
- ISO 14001 certified
- May 2006
- Air suspension of 3Ton air drop hammer anti-vibration device completed
- August 2006
- Completed air suspension of 8Ton air drop hammer anti-vibration device
- May 2007
- Increased special high-voltage power receiving facilities to 15,000 KVA and 60KV
- March 2008
- ISO 9001 certified
- April 2008
- Introduction of double-acting hydraulic press Unit 4
- March 2010
- Completed air suspension of 4,000-ton high-speed screw press anti-vibration device
- March 2011
- Started electrification of forklifts (7 units installed in total)
- March 2012
- Introduction of three additional electric forklifts (10 in total)
- March 2012
- Magnetic particle flaw detector replacement
- March 2012
- Introduction of machining center (simultaneous replacement of two milling machines following NC)
- December 2012
- Completed air suspension of 10Ton air drop hammer anti-vibration device
- November 2013
- 10Ton Air Drop Hammer Update
- August 2015
- Installed two 100KW inverters and compressors
- October 2018
- Installed two 160KW inverters and compressors
- January 2019
- 8Ton line heating furnace (regeneration) update